www免费看.男人的天堂|日本一区二区三区不卡免费|114级毛片免费观看|亚洲高清视频免费

<sub id="73jv7"></sub>

<form id="73jv7"></form>

<sub id="73jv7"></sub><address id="73jv7"></address>

    <sub id="73jv7"></sub><address id="73jv7"></address>

        歡迎光臨KASTAS中國供應商官方網站
        熱門搜索:

        推薦產品

        聯系我們

        天津金建華密封技術開發有限公司

        手 機: 18522693298

        聯系人: 王經理

        Q Q:1799075

        電  話: 022-87801301

        郵  箱: tjjjhmf@163.com

        地 址: 天津市南開區南泥灣路與延安路交口北方城三區8-26

        氣動防塵圈
        你的當前位置:網站首頁 > 產品中心  >  氣動防塵圈
        產品名稱:KASTAS/K103 雙唇防塵圈
        發表日期:2018-7-26
        咨詢電話:022-87801301
        上一個: KASTAS/K102 防塵圈
        下一個: KASTAS/K107 防塵圈

        產品介紹

        型號 適用 材料 壓力(Bar) 速度(m/s) 溫度(℃) PDF資料下載
        K103 活塞桿 PU ; 1.0 -40/+100

        KASTAS/K103 雙唇防塵圈

        KASTAŞ NO d (f8) D (H10) D1 (H11) S1 (-0/+0,2) S2
         K103-020 20 28 24,3 5 7
         K103-025 25 33 29,3 5 7
         K103-028 28 36 32,3 5 7
         K103-030 30 38 34 6 8
         K103-035 35 43 39 6 8
         K103-040 40 48 44 6 8
         K103-045 45 53 49 6 8
         K103-050 50 58 54 6 8
         K103-055 55 63 59 6 8
         K103-060 60 68 64 6 8
         K103-070 70 80 75 7 10
         K103-075 75 85 80 7 10
         K103-080 80 90 85 7 10
         K103-090 90 100 95 7 10
         K103-100 100 110 105 7 10
         K103-125 125 138 132 8 11
         K103-140 140 153 147 8 11
         K103-150 150 163 157 8 11
         K103-180 180 193 187 8 11
         K103-200 200 213 207 8 11



        K103 is a single acting double wiper ensuring that foreign particles are not introduced into the hydraulic cylinders. The lip is designed in a particular way that it reliably wipes off  the dirt but leaves a residual oil film on the rod.

        PRODUCT ADVANTAGES
        • Good wiping effect
        • Wide range of dimensions
        • No twisting in the housing
        • Wiper lip reliably wipes away dirt and leaves a residual oil film on the retracting rod.
        • Double lip makes additional protection to prevent the particles to enter into the cylinder
        • Easy installation

        APPLICATION
        Construction machinery , fork-lift trucks , injection moulding machines , agricultural machinery and standard cylinders.

        MATERIAL CODE
        PU 92 SHORE A PU9201
        OPERATING CONDITIONS
        MEDIA Mineral oils (DIN 51524)  HFA ve HFB HFC
        TEMPERATURE -30°C +100°C +5°C +50°C -30°C +40°C
        SPEED ≤1.0 m/sn ≤1.0 m/sn ≤1.0 m/sn
        Note: The above data are maximum values and cannot be used at the same time


        咨詢訂購

        產品名稱:
            *(必填)
         聯系人:
            *(必填)
            公司名稱:
           
         地址:
            *(必填)
            手機號碼:
            *(必填)
            郵箱:
           
        備注:
           
        驗證碼:
            驗證碼,看不清楚?請點擊刷新驗證碼  *(必填)
         

        在線客服

        在線咨詢

        在線客服