天津金建華密封技術開發有限公司
手 機: 18522693298
聯系人: 王經理
Q Q:1799075
電 話: 022-87801301
郵 箱: tjjjhmf@163.com
地 址: 天津市南開區南泥灣路與延安路交口北方城三區8-26
型號 | 適用 | 材料 | 壓力(Bar) | 速度(m/s) | 溫度(℃) | PDF資料下載 |
K102 | 活塞桿 | PU STEEL | ; | 1.0 | -35/+110 | ![]() |
Kastaş No | d(f8) | D(H8) | S1 (-0/+0,3) | b | c |
K102-045 | 45 | 62 | 8 | 8 | 1 |
K102-050 | 50 | 62 | 8 | 8 | 1 |
K102-060 | 60 | 72 | 8 | 8 | 1 |
K102-070 | 70 | 85 | 8 | 8 | 1 |
K102-080 | 80 | 95 | 8 | 8 | 1 |
K102-090 | 90 | 105 | 10 | 10 | 1 |
K102-100 | 100 | 118 | 8 | 8 | 1 |
![]()
K102 is a single acting wiper ensuring that foreign particles are not introduced into the hydraulic systems , avoiding wear and damage to all the internal components including seals.
PRODUCT ADVANTAGES
APPLICATION |
||||||||||||||||||||
|
||||||||||||||||||||
|
版權所有:天津金建華密封技術開發有限公司 關鍵字:進口油封,進口密封件 技術支持:金尚銘網絡
服務熱線:022-87801301 手機:18522693297 郵箱:tjjjhmf@163.com
公司地址:天津市南開區南泥灣路與延安路交口北方城三區8-26 郵編:300112
掃一掃關注我們