天津金建華密封技術開發有限公司
手 機: 18522693298
聯系人: 王經理
Q Q:1799075
電 話: 022-87801301
郵 箱: tjjjhmf@163.com
地 址: 天津市南開區南泥灣路與延安路交口北方城三區8-26
型號 | 適用 | 材料 | 壓力(Bar) | 速度(m/s) | 溫度(℃) | PDF資料下載 |
K94 | 活塞桿 | PU | ; | 1.0 | -35/+110 | ![]() |
KASTAŞ NO | d(f8) | D(H11) | D1(+0.1/-0.1) | S1(+0.2/-0.0) | a(+0.1/-0.0) |
K94-100 | 100 | 112.2 | 106 | 7.1 | 2.8 |
K94-110 | 110 | 125 | 120 | 9.5 | 2 |
K94-120 | 120 | 135 | 130 | 9.5 | 2 |
K94-125 | 125 | 140 | 135 | 9.5 | 2 |
K94-130 | 130 | 145 | 140 | 9.5 | 2.25 |
K94-140 | 140 | 155 | 150 | 9.5 | 2 |
K94-50 | 50 | 58 | 55 | 5 | 1.5 |
K94-60 | 60 | 70 | 67 | 6.3 | 1.5 |
K94-70 | 70 | 82.6 | 78.4 | 8 | 2 |
K94-80 | 80 | 90 | 87 | 6.7 | 1.8 |
K94-80-1 | 80 | 90 | 87 | 6.3 | 1.5 |
K94-90 | 90 | 102.2 | 96 | 7.1 | 2.8 |
K94 is a single acting wiper ensuring that foreign particles are not introduced into the hydraulic system. PRODUCT ADVANTAGES•Very good wiping performance •Simple , easy-construction groove •No twisting in the house •Specially designed to prevent hydrodynamic pressure build-up •Specially designed to provide excellent sealing against big particles , humidity and water •Used in heavy conditions by the good mechanical properties of Polyurethane material APPLICATION Mining industry , heavy-duty , concrete pumps , mobile applications , telescopic cylinders. |
||||||||||||||||||||
|
||||||||||||||||||||
|
版權所有:天津金建華密封技術開發有限公司 關鍵字:進口油封,進口密封件 技術支持:金尚銘網絡
服務熱線:022-87801301 手機:18522693297 郵箱:tjjjhmf@163.com
公司地址:天津市南開區南泥灣路與延安路交口北方城三區8-26 郵編:300112
掃一掃關注我們